Advanced Search
CHENG Wenfeng, DING Xiuheng, WEI Ran, LI Cheng, LI Wei. Protective Technology on Metro Section Tunnel Constructed with Shield Passing Underneath Operating Tunnel[J]. Journal of Technology, 2019, 19(2): 163-167. DOI: 10.3969/j.issn.2096-3424.2019.02.011
Citation: CHENG Wenfeng, DING Xiuheng, WEI Ran, LI Cheng, LI Wei. Protective Technology on Metro Section Tunnel Constructed with Shield Passing Underneath Operating Tunnel[J]. Journal of Technology, 2019, 19(2): 163-167. DOI: 10.3969/j.issn.2096-3424.2019.02.011

Protective Technology on Metro Section Tunnel Constructed with Shield Passing Underneath Operating Tunnel

  • Taking the project of the section tunnel between Jinjihuxi Station and Dongfangzhimen Station of Suzhou Metro Line 3 passing underneath Line 1 as an example, protective measures of the installation of rail protections for anti-removal and the traffic control were put forward to prevent the track sinking of Line 1 and to reduce the influence of settlement on the safety of vehicle operation. The scope and detailed installation process of rail protections for anti-removal were introduced, and the feasibility of the technology was verified by field monitoring, providing the guidance for similar projects in the future.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    摩臣5娱乐专业提供✂️🦜:摩臣5娱乐摩臣5摩臣5平台等服务,提供最新官网平台、地址、注册、登陆、登录、入口、全站、网站、网页、网址、娱乐、手机版、app、下载、欧洲杯、欧冠、nba、世界杯、英超等,界面美观优质完美,安全稳定,服务一流,摩臣5娱乐欢迎您。 摩臣5娱乐官網xml地圖